Water Main Lining

WATER MAIN LINING

Water main Lining
Location: Water Filtration Plant Mattagami river crossings & 681 Algonquin Blvd E. Water Main
Value: $1,698,960.00
Contractor: Fer Pal Construction
Completion: Fall 2021
Status: Awarded
Project Manager: Scott Collin
On-Site Inspector: Joseph Polowy
Email: [email protected]
Phone: (705)360-2600 ext. 4860

Project Details:
The 2021 watermain contract will include the lining two Mattagami River crossings from the Water Filtration Plant to Pavillion Dr. as well as a watermain running through #681 Algonquin Blvd. East. This contract will have approximately 650m of watermain rehabilitation.