Mattagami Water Pollution Control Plant Bypass Report - April 18, 2025 

Mattagami Water Pollution Control Plant Secondary Bypass Report

Address: 551 Airport Road
Start date: April 18, 2025
Start time: 11:25 am
End date: April 18, 2025
End time: 2:40 pm
Volume by-passed: 2209.267 m3

Support Our Wastewater System:
During spring melt and heavy rain events, the increased water entering the sewer system can exceed the capacity of our wastewater system, leading to potential overflows. Residents can help by conserving water, managing runoff on their properties, and keeping our pipes clear—no wipes in the pipes! Learn more about how the system works and what actions you can take at www.timmins.ca.

Posted by Cyndee Villeneuve On 4/22/2025 at 3:43 PM  

 
  • © 2018 City of Timmins. All Rights Reserved.