Notices of Disruption



Recent Posts
<<  2  3  4  5  6  7  8  9  10  11 

Please be advised that Mattagami Blvd. S. from Algonquin Blvd. to Wilson Ave. will be closed starting Monday, October 31 until Wednesday, November 2, 2022.

Work is being completed on asphalt and curbs along the Connecting Link.

We apologize for any inconvenience this may cause.

Posted by Amanda Dyer  On Oct 28, 2022 at 10:45 AM
  

Please be advised that the intersection of Gillies Ave. and Ann Ave. will remain closed until October 31, 2022.

Work to connect water and sewer mains to a house is on-going. Gillies Ave. is closed at Vimy and Oak.

We apologize for any inconvenience this may cause. 

Posted by Amanda Dyer  On Oct 27, 2022 at 12:06 PM
  
Please be advised that the intersection of Brousseau Ave. and Hart St. is closed starting TODAY, October 25 until October 28, 2022.

The closure is to facilitate a a storm sewer manhole replacement. 

We apologize for any inconvenience and thank-you for your cooperation.
Posted by Amanda Dyer  On Oct 25, 2022 at 9:12 AM
  
Please be advised that Lamminen Ave. will be closed from Suzanne St. to Airport Rd. for paving this Sunday, Oct. 23. 2022.

Lamminen Ave. will be closed in the morning and reopened in the afternoon/evening once work is complete.

Thank you for your cooperation.
Posted by Amanda Dyer  On Oct 21, 2022 at 3:37 PM
  

Please be advised that the Terry Fox Trail between Mattagami Blvd. and Bannerman Ave. will be closed starting today, October 19, 2022, for maintenance. 

Crews will be raising and resurfacing this section of the trail, weather permitting. The trail is expected to be open again by October 28, 2022.

We apologize for any inconvenience this may cause.

Posted by Amanda Dyer  On Oct 19, 2022 at 9:55 AM
  

Please be advised that the hot pool at the Archie Dillon Sportsplex is closed until further notice for maintenance.

We apologize for any inconvenience this may cause.

Posted by Amanda Dyer  On Oct 17, 2022 at 4:15 PM
  

Please be advised that a section of Preston Ave. is closed to local traffic only between Commercial and Wilson AND Belanger Ave. is closed to local traffic only between Rea St. S. and Wilcox starting TODAY, October 17 until October 28, 2022.

The closure is to facilitate work at the intersection of Preston and Belanger to make necessary sewer infrastructure repairs. Traffic signals are in place. 

We apologize for any inconvenience and thank-you for your cooperation.

Posted by Amanda Dyer  On Oct 17, 2022 at 11:32 AM
  
Please be advised that Hwy 101 E. between Rae Hill and the Tisdale Cemetery will be reduced to one lane in each direction and closed in 10-15-minute increments on Sunday, October 16 between 7:30 a.m. and 11:30 a.m. (revised time).

Hydro One will be occupying both east and westbound curb lanes as they perform a removal of four conductors on a distribution line that crosses Hwy. 101 E. Crews will have the highway closed for approximately 10-15 minutes at a time as they lower each conductor. Traffic controls will be in place and plans are in place to accommodate any emergency vehicles that require access.

Thank you for your cooperation.
Posted by Amanda Dyer  On Oct 14, 2022 at 12:59 PM
  

Please be advised that the community splash pads are officially closed for the season. The city docks at the boat launch will also be removed effective Wednesday, October 12, 2022.

 

Posted by Amanda Dyer  On Oct 11, 2022 at 4:02 PM
  

Please be advised that Bloor Ave. is closed between Moore and Crawford October 11 and 12 while crews make a sanitary repair. 

Work is being completed at the intersection of Bloor and Main, so Main St. is also closed between Bruce and Shamrock.

We apologize for any inconvenience this may cause. For people looking to visit the C.M. Shields library, access is via Crawford. 

Posted by Amanda Dyer  On Oct 11, 2022 at 12:35 PM
  

Please be advised that MacLean Dr. will be closed between Polaris and Jade on Tuesday, October 12, 2022. Closure time will be 9:15 a.m. to 2:45 p.m.

Crews will be completing sewer main lining in the area. Traffic controls will be in place. 

Thank you for your cooperation. 

Posted by Amanda Dyer  On Oct 11, 2022 at 11:33 AM
  

Due to an electrical issue, all ice time is canceled tonight, September 28, 2022, at the McIntyre Arena while repairs are made.

We apologize for the inconvenience. Thank you for your understanding.

Posted by Amanda Dyer  On Sep 28, 2022 at 3:21 PM
  

Laforest Rd. at Hwy. 655 will be reduced to single lane on Tuesday, Sept. 27, 2022 for paving operations. This is the final "grind and pave" project for 2022. 

Traffic controls will be in place. Drive with caution when approaching any construction zone. 

Thank you for your cooperation. 

Posted by Amanda Dyer  On Sep 26, 2022 at 4:54 PM
  

Lamminen Ave. will be closed between Airport Rd. and Suzanne St. beginning Tuesday, September 27 to Thursday, September 29, 2022.

The closure is necessary to finish watermain installation as crews work to complete infrastructure repairs.

Thank you for your continued patience.

Posted by Amanda Dyer  On Sep 26, 2022 at 4:51 PM
  
Due to high water levels, the City of Timmins has had to temporarily shut down a couple of portions of the Mattagami Boat Launch due to unsafe conditions.

Thank you for your cooperation.

Posted by Amanda Dyer  On Sep 21, 2022 at 9:53 AM
  

**Updated September 15, 2022**

The City of Timmins will observe the National Day of Mourning to honour Her Majesty Queen Elizabeth II on Monday, September 19, 2022.

City Hall and Service Timmins will be closed. The Provincial Offences off at City Hall will be closed. The Archie Dillon Sportsplex pool, Timmins Museum National Exhibition Centre, and both branches of the Timmins Public Library will also be closed on Monday.

There will be no disruption to waste collection or Timmins Transit. Garbage and recycling pick-up will happen on schedule. The Deloro Landfill will remain open. Timmins Transit will run as scheduled. 

The National Day of Mourning in Canada coincides with Her Majesty’s State Funeral in London and the end of the official period of mourning in Canada.

Posted by Amanda Dyer  On Sep 16, 2022 at 4:08 PM
  

Please be advised that temporary traffic lights have been set up between Lonergan Blvd. and Riverpark Rd. as part of the Airport Rd. watermain work that is currently underway.

Traffic between this section of Airport Rd. will be reduced to one lane effective Tuesday, September 13 until Friday, September 16, 2022. Work to remove trench cages at two more locations along Airport Rd. is expected to take no more than 4 days.

Thank you for your continued patience as we work to complete this infrastructure project.

For full project details visit: https://www.timmins.ca/our_services/engineering/capital_works/2022_capital_works/watermain_lining

Posted by Amanda Dyer  On Sep 13, 2022 at 10:20 AM
  

Please be advised that water will be shut off in the area surrounding the Connecting Link construction zone along Algonquin Blvd. on the evenings of Sept. 12 AND Sept. 13, 2022 beginning at 9:00 p.m. and for a period of approximately 9 hours.

The shut off area is specific to the construction zone site and will impact businesses and homes along Algonquin Blvd. between Theriault Blvd. and Mountjoy St. including the Preston St. apartments, extending up Rea St. N. immediately behind  the grocery store and Hollinger Plaza.

This is necessary to work on water infrastructure in the construction zone.

When the water flow returns, you may experience discoloured water. Before using the water, it is recommended to run your cold-water taps for a minimum of 10 minutes until the water runs clear. You may need to do this once water is turned on from each disruption.

Residents and businesses in the area have been notified by contractors.

Thank you for your continued patience as we work towards project completion.

Posted by Amanda Dyer  On Sep 12, 2022 at 12:37 PM
  

Please be advised that contractors will start controlled blasting in the Connecting Link construction zone beginning Monday, Sept. 12. 2022. Blasting will be on-going until further notice and will occur Monday to Friday between 7am and 7pm.

Controlled blasting is being done to remove bedrock from pipe trenches located from Preston Ave. moving west towards Mountjoy St. This is to facilitate continued installation of underground infrastructure along Algonquin Blvd.

Noise and vibration in the area are to be expected. Contractors will work to control dust from blasting activities.

Controlled blasting is being done to remove bedrock from pipe trenches located from Preston Ave. moving west towards Mountjoy St. This is to facilitate continued installation of underground infrastructure along Algonquin Blvd.

Businesses and residents in the area have been notified by contractors.

We appreciate your continued patience as we work towards project completion.

Posted by Amanda Dyer  On Sep 09, 2022 at 2:33 PM
  

Please be advised that the Mattagami River Boat Launch piers will be closed to public use on September 12 and 13, 2022.

This is to accommodate an engineering inspection.

Thank you for your cooperation.

Posted by Amanda Dyer  On Sep 09, 2022 at 9:10 AM
  
<<  2  3  4  5  6  7  8  9  10  11 
 
  • © 2018 City of Timmins. All Rights Reserved.